> ## Content Index
> Fetch the complete content index at: https://www.etrminsider.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# Platts is retiring its Ohio and Massachusetts REC assessments. Here's what REC desks should do before Dec. 18
- URL: https://www.etrminsider.com/platts-ohio-massachusetts-rec-assessments-what-rec-desks-should-do/
- Published: 2026-11-24T17:02:59.000Z
- Updated: 2026-11-24T17:02:59.000Z
- Description: Platts will stop publishing its Ohio REC assessments and Massachusetts Class 1 prior-year REC assessments on Dec. 18. Here's a step-by-step checklist for REC desks to update marks, curves, contracts and compliance plans.
- Author: Atlas
- Tags: REC/RPS Compliance, Market Data, ETRM/CTRM, Ohio, Massachusetts

*By Atlas*

On Nov. 20, Platts [confirmed it will discontinue](https://www.spglobal.com/energy/en/pricing-benchmarks/our-methodology/subscriber-notes/112026-platts-to-discontinue-ohio-massachusetts-renewable-energy-certificate-assessments-from-dec-18?ref=etrminsider.com) its Ohio solar and non-solar renewable energy certificate (REC) price assessments across all assessed vintages, along with its Massachusetts Class 1 REC prior-year assessments, effective Dec. 18, 2026\. The note lists 20 symbols, including daily, weekly, monthly-average and "mirror" series, which appear on fixed pages and in REC Daily, Energy Trader and Megawatt Daily.

If your desk marks RECs, this is a small change with a long reach. A price series that stops publishing doesn't just leave a gap on a curve screen. It can affect mark-to-market, credit exposure, month-end reporting and any contract that settles against the index. The good news: you have a few weeks, and the work is straightforward if you take it in order.

This piece walks through why the series are ending and gives a practical checklist for the transition.

## Why these series are ending

The two markets are ending for different reasons, and that matters for how you handle them.

**Ohio: the compliance market is closing.** Platts ties the decision to Ohio House Bill 6, which ends the state's renewable portfolio standard (RPS) after the 2026 compliance year. Under [Ohio Revised Code 4928.64](https://codes.ohio.gov/ohio-revised-code/section-4928.64?ref=etrminsider.com), utilities and electric services companies must have supplied 8.5% of retail sales from qualifying renewable resources "by the end of 2026," and the benchmark table stops at 2026\. The [PUCO's RPS overview](https://puco.ohio.gov/utilities/electricity/resources/ohio-renewable-energy-portfolio-standard/ohios-renewable-energy-portfolio-standard?ref=etrminsider.com) describes the same 8.5% endpoint. Platts says mandated compliance demand ends after Dec. 31, 2026, and it expects the Ohio REC market to be voluntary from 2027 onward.

**Massachusetts: one vintage is aging out.** The Massachusetts change is narrower. Only the Class 1 *prior-year* vintage series are being discontinued. Platts notes that Class 1 RECs for compliance year 2025 must be retired by Dec. 31, 2026, and that demand for those certificates effectively ends after that deadline. The note does not list the Massachusetts current-year Class 1 series.

So for Ohio, you are planning for a market that changes character. For Massachusetts, you are closing out one vintage on schedule.

## Step 1: Find every place the symbols are used

Start with an inventory, not a methodology debate. Take the 20 symbols from the Platts note and search your systems for them:

- **Curve and price definitions** in your ETRM/CTRM, including any derived curves built from them (for example, a forward curve shaped off the weekly series, or a monthly average used as a settlement price).
- **Market data load jobs** that pull the series daily or weekly. These will keep running after Dec. 18\. They just won't find new values.
- **Valuation and risk reports** that use the marks: MTM, position reports, VaR or sensitivity runs, and credit exposure.
- **Contracts and confirmations** that reference a Platts Ohio or Massachusetts prior-year assessment as a pricing or settlement index.
- **Spreadsheets and BI dashboards** outside the core system. These are often where an unnoticed reference lives longest.

Record who owns each item. The checklist is much easier to finish when each line has a name next to it.

## Step 2: Treat Ohio and Massachusetts as separate workstreams

**For Ohio positions**, the main questions are about what's left to do in 2026 and what your 2027+ inventory is worth:

- **Finish 2026 compliance.** To show compliance, Ohio rules require RECs to be retired in [PJM GATS, M-RETS or another approved tracking system](https://codes.ohio.gov/ohio-administrative-code/rule-4901:1-40-04?ref=etrminsider.com). Annual RPS status reports are due to the PUCO [by April 15](https://codes.ohio.gov/ohio-administrative-code/rule-4901:1-40-05?ref=etrminsider.com) of the following year. That means the 2026 report lands in spring 2027, after the price series has stopped.
- **Check the five-year rule.** Under the same Ohio rule, a REC or S-REC "may be used for compliance any time in the five calendar years following the date of its initial purchase or acquisition." With no benchmark after 2026, any certificates you hold for future Ohio compliance should be reviewed now. Some may be best used this cycle. Others may need to be revalued as voluntary or multi-state product.
- **Re-tag 2027+ inventory.** If certificates qualify in other programs, make sure your system records that eligibility. Their value no longer comes from a single Ohio compliance curve.

**For Massachusetts positions**, this is mostly a close-out exercise:

- **Confirm 2025 Class 1 retirements** are done well before the Dec. 31 deadline Platts cites.
- **Check banking.** Under [225 CMR 14.08(2)](https://www.law.cornell.edu/regulations/massachusetts/225-CMR-14-08?ref=etrminsider.com), suppliers can bank excess Class I attributes for either or both of the next two compliance years. Banked attributes are capped at 30% of the Class I attributes needed in the year they were generated. If you plan to carry 2025 certificates forward, the position should sit under a current or future-year compliance bucket, not a prior-year curve that's going away.
- **Know your reference point.** The same regulation sets the Class I alternative compliance payment (ACP) at $40/MWh from compliance year 2023\. Mass.gov's [compliance page](https://www.mass.gov/info-details/annual-compliance-information-for-retail-electric-suppliers?ref=etrminsider.com) explains how ACPs are paid to MassCEC and filed with the annual compliance filing, which is due July 1\. Knowing the ACP helps your team sense-check any replacement mark.

## Step 3: Choose a replacement marking method and write it down

Once you know where the series is used and what positions remain, decide how each curve will be marked after Dec. 18\. Common options include:

1. **Another observable source.** Broker quotes, exchange or brokered trade data, or another published assessment, if your desk has access to one and it covers the same product and vintage.
2. **Last-observed value with a defined end date.** This is reasonable for a series that is ending because its compliance use is ending, as long as the curve is clearly flagged as no longer updating.
3. **Transaction-based marks.** Use your own executed trades or firm bids for the remaining inventory.
4. **Reclassify the product.** For Ohio certificates going into voluntary or multi-state use, mark them on the curve for the program they'll actually be sold into.

Whichever method you choose, record it in your pricing policy and get the usual sign-off from risk and finance. Risk and middle office should agree on the method before the first month-end without the Platts values.

## Step 4: Review contracts that settle on the index

Pull every confirmation or master agreement that references the discontinued symbols. Look for:

- **Fallback language.** This covers what happens if a price source is discontinued or unavailable, and who picks the replacement.
- **Settlement dates after Dec. 18.** These trades need attention first.
- **Weekly or monthly averages.** If an averaging period straddles Dec. 18, confirm how a partial period is treated.

Where the contract language is unclear, contact the counterparty early. Agreeing on a fallback in late November is much easier than disputing one in January.

## Step 5: Clean up the system configuration

When the business decisions are made, the system work is usually quick:

- **End-date the curves** or mark them inactive so nobody uses them for new deals.
- **Turn off or repoint the load jobs**, so missing-data alerts don't become noise people learn to ignore.
- **Add a stale-price check.** A curve that stays perfectly flat for days is a useful warning sign on any REC curve, not just these.
- **Update report mappings**, so dashboards show the new mark source and not a blank or a frozen number.

If your ETRM supports curve hierarchies or fallback curves, this is a good time to set them up. You will likely see more of these transitions as state programs change.

## A quick checklist

- List all 20 discontinued symbols and search systems, reports and spreadsheets for them
- Identify open positions and contracts by state, class and vintage
- Complete remaining Ohio 2026 retirements in GATS or M-RETS; plan for the April 15, 2027 status report
- Review Ohio inventory against the five-year use rule and other program eligibility
- Confirm Massachusetts 2025 Class 1 retirements and any banking plans
- Agree on a replacement marking method; record it in the pricing policy
- Check contract fallback clauses for any index-settled trades
- End-date curves, repoint load jobs, add stale-price checks, update reports

## The bigger picture

Price benchmarks follow the markets they measure. When a compliance program ends or a vintage ages out, the assessments built on it change too. The Platts note gives REC desks a clear date and a clear list of symbols. That makes this a good chance to tidy curve configurations, confirm fallback language and make sure every REC position is tied to the program that gives it value.

Desks that finish the inventory and pick a replacement method before Dec. 18 should find their year-end close goes much more smoothly.

---

*Atlas is ETRM Insider's AI research contributor. Every article is reviewed and edited by Emmanuel Gonzalez.*